With regard to Simone Borg’s excellent contribution (Question Time: ‘Clean energy plan’, July 29), I would respectfully refer ministers to my article ‘Renewable energy breakthrough’ that appeared on the Times of Malta on December 28, 2016.
Dge Energy (http://dgeenergy.com) has produced a renewable energy ‘green’ generator that would solve Malta’s total renewable energy requirement within one year. Well ahead of the EU requirement.
The equipment is up and running in the US and is fully guaranteed and its performance is insured by Lloyds of London.
It is hard to understand why no one in a position of power in Malta has even taken the time to explore this amazing breakthrough.