MIDI’s master plan for Manoel Island makes a series of key improvements when compared to previous designs. The latest master plan focuses on preservation, sustainability and public well-being, while transforming Manoel Island into a space prepared for Malta’s future.

Right from the start, our objective was to create a vibrant project that blends history, large open spaces, a mixed array of residential, retail and mixed-use developments.

Together with iAS Periti, the firm who led the design process, we wanted to promote sustainable habits and profound respect to the environment, while at the same time create a pedestrian-friendly environment which is unique and not just an extension of the mainland.

The new master plan for Manoel Island aims to retain the aspects of the mixed-use development and will be enhancing this by placing a stronger emphasis on creating more open and larger public spaces, reducing the previously contemplated footprint of new development to approximately 10 per cent, providing a better mix in the commercial areas, and better integration of the existing heritage buildings through the public spaces.

A key objective is the creation of a well-connected, pedestrian-friendly and safe environment which is accessible to all. A place with a genuine sense of community and belonging while deeply rooted in the Maltese culture. The master plan also seeks to combine better accessibility to the heritage sites with a diversified commercial, cultural and sustainable offer. It is envisaged that this synergy will strengthen the attraction of the island to both potential visitors and residents.

Restoration of heritage buildings

The existing heritage buildings are central to the design philosophy of the new master plan. The new master plan provides a new lease of life to the heritage buildings present on Manoel Island, including Fort Manoel, which has already been restored. The Customs House, St George’s Chapel and the Cattle Shed will occupy prominent positions within the new 35,000sqm open space which extends from the bridge to the Lazzaretto quay. These buildings will be restored to provide an animated commercial offering which complements the surrounding open spaces. Additionally, the Lazzaretto will be restored and adapted as a mixed-use development, including hospitality accommodation.

Public open spaces and accessibility

One of the key drivers for this master plan is the extent of the new public open space. The aspiration of this development is to create several new open spaces in prominent places within the development which, while integrating better the heritage buildings, create open spaces of recreation for the public’s enjoyment.

The archaeological sites uncovered during recent investigations have helped to create an additional 35,000sqm of public open space, which will be integrated into the development. Part of the 35,000sqm of this space will become a public garden which will be landscaped with indigenous trees, while the rest of the area will consist of public plazas with a limited commercial offering.

The quantity and quality of the public spaces are fundamental objectives of our new design, with a harmonious balance between public and private realm. In the new master plan, a great proportion of the land will remain accessible to the public and there will be improved accessibility to buildings of cultural heritage and the foreshore.

Furthermore, accessibility via sea will complement this objective with the introduction of strategically-placed water taxi landing points. The creation of an attractive pedestrian streetscape and environment with a reduced dependency on vehicles is also a key objective, making the island a pedestrian priority area.

Gżira FC pitch and Boċċi Club

In line with its contractual obligations, MIDI will be developing a new full-size football pitch for Gżira FC and facilities for the Gżira Boċċi Club.

The marina

The existing marina concession will be upgraded and the capacity of the marina will be increased to approximately 190 berths. Apart from pontoons, the marina will include a quay for larger berths which will be offered stern to berths. The marina will be protected by a floating breakwater which, in the new master plan, replaces the fixed breakwater which was originally contemplated. By providing a floating breakwater, the impact on the environment will be largely mitigated and the location of the breakwater ensures that the dive wreck site remains protected. 

The residences

Most of the residences will be located on the south shore and the central part of the island, separated in between by the large public open landscaped space. The residential buildings are also positioned on parts of the island where studies show that they will not impinge on archaeologically sensitive areas.

The building heights will be slightly terraced from the seafront towards the centre of the island to create a varied architectural skyline which respects the island’s topography.

The maximum height of the development will not exceed the height of the buildings in Fort Manoel.

No land reclamation

In a move away from the original plan that included 14,000sqm in land reclamation, the revised master plan does not include the land reclamation originally contemplated as part of the development. As a result, the residential block which was proposed for the north shore entrance to Manoel Island will not be developed, thus reducing the impact on the Gżira community.

Guardianship agreement

In a first for Malta, the Manoel Island development is subject to a guardianship agreement.

The Manoel Island Foundation – a non-profit foundation set up between MIDI plc and the Gżira local council – will act as guardian of the rights and obligations agreed in the master plan.

This agreement safeguards public interest by ensuring access to the foreshore, protecting heritage buildings, regulating new building heights and providing public open spaces and cultural offerings – ensuring that the new MIDI master plan for Manoel Island is an investment in Gżira and Malta’s past, present and future.

More information about the new MIDI Manoel Island master plan can be found at www.manoelisland.com.mt.

Ivan Piccinino, Head of projects, MIDI

Sign up to our free newsletters

Get the best updates straight to your inbox:
Please select at least one mailing list.

You can unsubscribe at any time by clicking the link in the footer of our emails. We use Mailchimp as our marketing platform. By subscribing, you acknowledge that your information will be transferred to Mailchimp for processing.